Light sandy beach with palms and vegetation beside the sea.

Panama · Coiba and Santa Catalina

What is closed or limited in 2026

MiAmbiente is rebuilding the park headquarters over 24 months from April 2026. Meanwhile you cannot sleep on Coiba, Granito de Oro is closed and visits to the old prison are suspended from May 2026 for six months.

4 places4 closed or restricted, flagged

  1. 1

    NatureRestricted access

    Coiba National Park

    Gulf of Chiriquí, off the south coast of Veraguas; 1 to 1.5 hours by boat from Santa Catalina.62 km from the centre

    Entry
    B/.20
    Hours
    8:00 to 15:00
    Booking
    Required

    Marine and land national park in the Gulf of Chiriquí, a UNESCO World Heritage Site since 2005. It protects Coiba, the largest island in Central America, 38 smaller islands and the surrounding sea, with 33 shark species and 20 cetacean species recorded.

    Open for day visits only. MiAmbiente suspended overnight stays while the new Gambute headquarters is built (24 months from 3 April 2026). Granito de Oro island remains fully closed, and visits to the old prison are suspended from 1 May 2026 for six months. Visit the park on a day tour from Santa Catalina or Pixvae.

    Source: Sistema de Reserva de Áreas Protegidas – MiAmbiente · 2026 · +9

    Practical details and sources
    Entry
    Admission in MiAmbiente's payment system (2026): foreign adult B/.20; Panamanian adult B/.5; foreign student B/.10; Panamanian student B/.3; senior B/.2.50; under-12s free. Local operators reviewed publish the same figure (US$20 foreigners, US$5 Panamanians and residents) separately from the tour price; Scuba Coiba and Premier Coiba Tours state it per person per day.
    Hours
    In 2022 MiAmbiente set visits from 8:00 to 15:00 from Santa Catalina, Playa Banco and Puerto Mutis. 2026 hours not confirmed by the official source at the time of review.
    Booking
    MiAmbiente sells the entry online (reservasap.miambiente.gob.pa): you choose the date and register each visitor's details and ID document (ID card or passport, as applicable); the page announces payment through the PlaceToPay gateway: check the accepted methods when paying. A MiAmbiente notice of April 2022 announced that from 1 July 2022 cash would no longer be collected in the park and that entry would be refused without proof of payment; the official sources reviewed (October 2026) show no Coiba-specific update. For their part, Premier Coiba Tours (page checked October 2026) says the fee is paid directly to Coiba National Park on the day of the trip, in cash before boarding, and Snorkel Coiba (guide updated June 2026) says it is paid in cash on arrival, without specifying to whom. Before paying, confirm with your operator who receives the money, by what means, what receipt proves your entry and whether it has already been arranged; if this does not match MiAmbiente's information, check with MiAmbiente.

    Tip: Bring your passport. Coiba is a feeding ground for hawksbill turtles: MiAmbiente has monitored them for more than 12 years and recorded 887 individuals (February 2026).

    Nearby: Bahía Damas reef (13 km)

    Sources: Sistema de Reserva de Áreas Protegidas – MiAmbiente · MiAmbiente inicia obras de rehabilitación en el Parque Nacional Coiba y limita acceso a visitantes – TVN · MiAMBIENTE anuncia cambios en el sistema de pagos para ingreso al PN Coiba · Se restablece capacidad de carga del Parque Nacional Coiba – MiAmbiente · Coiba fortalece la protección de la tortuga carey – MiAmbiente · Coiba National Park and its Special Zone of Marine Protection – Natural World Heritage Sites · Snorkel Coiba (operador) · Ultimate Guide to Visiting Coiba National Park – Snorkel Coiba · Coiba Day Trip – Premier Coiba Tours · Dive Trips with Scuba Coiba (operador)

    Find tours(external link) Link to an external platform. Prices, schedules and availability are set by each operator.
  2. 2

    NatureRestricted access

    Gambute ranger station and visitor center

    Gambute sector, northeast Coiba island.52.4 km from the centre

    Entry
    Not stated
    Hours
    Not stated
    Booking
    Not stated

    The park's headquarters on the northeast of Coiba island, where visits are registered. Day tours usually stop here; there is a visitor center and short trails.

    Under construction since 3 April 2026 (24 months): new headquarters, ranger posts, laboratory, visitor center and dock. The station runs limited daytime services and overnight stays are not allowed. In July 2025 MiAmbiente temporarily closed the Cerro Gambute trail; its reopening is not confirmed by the official source at the time of review.

    Source: MiAmbiente inicia obras de rehabilitación en el Parque Nacional Coiba – TVN · 2026 · +3

    Practical details and sources
    Booking
    Boat operators must register passenger and vessel details at Gambute (MiAmbiente, 2022). According to the operator Snorkel Coiba (guide updated June 2026), visitors arrive with a licensed boat operator and independent boats are not permitted for tourists; MiAmbiente's 2022 notice does not expressly ban or authorize independent access.

    Tip: In 2022 MiAmbiente listed three visitor trails: Los Monos, Gambute and Mirador. Ask your guide which ones are open on the day of your visit.

    Nearby: Ranchería island (Coibita) (3.3 km) · Granito de Oro island (4.2 km) · Canal de Afuera island (13.5 km)

    Sources: MiAmbiente inicia obras de rehabilitación en el Parque Nacional Coiba – TVN · MiAMBIENTE ejecuta obras para la nueva sede y muelle en el Parque Nacional Coiba · Se restablece capacidad de carga del Parque Nacional Coiba – MiAmbiente · Ultimate Guide to Visiting Coiba National Park – Snorkel Coiba

  3. 3

    BeachClosed or prohibited

    Granito de Oro island

    Off Coiba's northeast coast, south of Ranchería.50.6 km from the centre

    Entry
    Not stated
    Hours
    Not stated
    Booking
    Not stated

    White-sand islet northeast of Coiba, known for snorkeling on its reef. It was the most popular day-tour stop before the closure.

    Fully closed to let its reefs recover; MiAmbiente kept the closure in April 2026 and announced no reopening date. Snorkel tours use other stops, such as Coco Grande, Coco Pequeño, Canal de Afuera and Ranchería.

    Source: MiAmbiente inicia obras de rehabilitación en el Parque Nacional Coiba – TVN · 2026 · +1

    Cannot be saved: it is closed or prohibited.

    Practical details and sources
  4. 4

    WaterRestricted access

    Bahía Damas reef

    East coast of Coiba island.51.5 km from the centre

    Entry
    Not stated
    Hours
    Not stated
    Booking
    Not stated

    Bay on the east coast of Coiba island with a 135-hectare coral reef, which Visit Panamá describes as one of the largest marine habitats on the continent.

    Bahía Damas is not on the list of visitor sites MiAmbiente published in 2022 (Gambute, Canal de Afuera, Playa Machete, Isla Coco, Ranchería, Isla Frijoles and three trails). Whether visits are allowed today is not confirmed by the official source at the time of review: check with your operator.

    Source: Parque Nacional Coiba – Visit Panamá (ATP) · 2026 · +1

More guides for this destination